City of Hampton Consent Order Program Management

Since 2008, Woolpert has been assisting the City of Hampton, Va., with several regional consent order (RCO) tasks to control sanitary sewer overflows.
- Flow evaluation report
- CMOM program—developed in accordance with EPA 2001 CMOM documents, guides the city in making improvements to operations and maintenance practices to reduce sanitary sewer overflows
- Annual report preparation
- SSES Plan—developed based on the results of the flow evaluation report; prioritized system-wide plan to conduct SSES field investigations to locate sewer system defects causing excessive inflows and infiltration (I&I)
- Regional hydraulic model
- City system hydraulic model—separate model of city’s gravity sewer system; will be used to perform capacity assessment during dry weather flow conditions
- Regional wet weather management plan—regional approach to significantly reduce the occurrence of SSOs through a combination of I&I reductions, wet weather storage and capacity expansion
Client
City of Hampton
Location
Hampton, VA