Xerion EV Battery and Cobalt Production Facility
Sector
Electric Vehicle Battery Manufacturing
Size
600,000 SF (200,000 SF R&D, 400,000 SF manufacturing)
Type
Site Due Diligence and Concept Design
Location
Dayton (Miamisburg), Ohio, United States
Woolpert prepared due diligence documents for a 200,000 square foot multistory research and development facility and a prospective 400,000 square foot single-story manufacturing facility, along with new parking, utility infrastructure, and a ground-mounted solar field. Before developing the architectural concept, Woolpert prepared a site intelligence report identifying site features and risks and proposing solutions and costs.
Preliminary due diligence verified compatibility with city zoning requirements and confirmed adequate infrastructure availability. The concept design for the office and R&D building includes a 10,000 square foot manufacturing prototype wing, an R&D wing, executive and general offices, and a gathering wing with cafeteria, conference, and exercise spaces, organized around a double-height entrance that doubles as a gathering space.