Lee Vista Boulevard Water and Force Mains

 
Image

Woolpert was selected to provide the following services for the installation of a new potable water main and sanitary force main:

  • Preliminary engineering
  • Surveying
  • Subsurface utility engineering
  • Design
  • Permitting
  • Bidding
  • Construction administration

The 30-inch potable water main runs approximately 22,590 linear feet, while the sanitary force main is approximately 28,390 linear feet in length. Both mains traverse Lee Vista Boulevard, continue through the Orange County Landfill, cross the Beachline Expressway (SR 528) through a micro tunnel and follow an existing easement through wetlands to the Carlsbad property’s southern boundary.

Woolpert also designed a 14-foot-wide stabilized access road to provide access for pipe maintenance along the existing utility corridor on the Carlsbad property.

Client
Orange County Utilities

Location
Orange County, FL