PIPELINE PROJECT, PHASE 2
![](https://woolpert.com/wp-content/uploads/2017/05/Mechanicstown-copy.jpg)
Project Details
CLIENT
A Midstream Oil and Gas Company
LOCATION
Eastern Ohio
Woolpert is providing route staking and pipeline as-built surveying services for more than 9,300 feet of a pipeline project. All survey work shall be performed in accordance with the applicable survey standards. Initially, Woolpert will create a stakeout file and alignment using the pipeline drawing files. After loading the pipeline alignment into their data collectors, Woolpert crews will head into the field to conduct pre-construction staking activities, including marking the pipeline limit of disturbance (LOD) and the center of the pipeline trench. After the pipeline is constructed, Woolpert will also provide as-built surveying services. Our survey crews will create a repository for pipe data to include information such as manufacturer-provided pipe specifications, 3D GPS locations (at ground level and each pipe weld) and welding and structural data (using a feature code library).